(313) 887-1297
Shop
Install 11 Data Drops
Perform Routine Maintenance on the Second HP Plott
Labor
Mount Networking Equipment, Connect Devices, Testi
Labor - Install 2 Data Drops
Labor - Install 5 Data Drops
Repair for HP Plotter
REPAIRED WIRING AT PBX TO ALLOW CALL ROUTING. REW
Labor - Configure Phone System, Train and Deploy R
Labor - Configure Firewall
Labor - Cabling for Displays
Configure NVR and Cameras
Cabling for Cameras
Configure NVR and Camera
Labor - DeMarc Runs
Labor - Overnight
Mount Antennas, Run Cat6 Cable to Each Router, Tes
Labor -
Cabling for Each Phone
Configuration
Labor - 3rd floor data center work
Phase 2 - Finalize Install, Rack Equipment, Decomm
Training Room 1 - Install 8 Cables
Cabling
Labor - DeMarc Runs - Overnight
Labor - Bank Cabling
Labor - DeMarc Runs - Dayside
Labor - Cabling
Setup and Configure AWS Server Solution
Cable Run
LABOR
Install and Mount 450\' Conduit for Fiber Ethernet
Mount Two Displays, One Wall Mount One Ceiling Mou
Cable Labor
Data Drop
Configure Call Groups, Call Flow, Voicemail, Notif
Connect and Test Secondary Device
General Setup, Provision Shell, Port Numbers, Setu
Training on Phone System and Mobility Functionalit
Data Line Installation
Labor - Cabling for POS System
Mount projector and Install Cabling for Access Poi
Install Outlets in Ceiling
Website Build
Global Alliance Solutions Website
Install and Cable the 2 Door Cameras
Repair Damaged Data Line for Manager Desk
Configure Wireless AP
Camera Cabling
Additional Install Labor
Configure DVR
Cable Run From MDF to Party Room
Relocate Firewall, Setup Switch in Basement, Run P
Install 2 Cat6 Data Cables
Install Cat6 Cable for Mortgage Bankers Phone
Network Configuration
Cabling and Configuration of DVR
Mount Displays
Setup PCs and Install all Applicable Applications
Recable entire sales office. Replace Keystones, Re
Configure Phone System and Train Users
Configure Firewall and Switch
Cable for 7 Locations - Dual Drops at Each
Tag n Tone Blue and Black Cables
Mount Equipment, Relocate Equipment, Install New H
Tag n Tone Blue Cables
Install New Devices, Bolt Rack, Install Cable Tray
A/V Labor
Install Data Line to Conference Room
re-routed cables at michigan first Evergreen locat
Relocate Current Infrastructure
Install Hardware, Work with Craig to Deploy Softwa
Cable for the Isonas Card Reader, Connect to Devic
Remove Old Cabling and ReCable Specified Areas
Install Cat6 Data Lines for 8 Cameras
Install APs at Breton Location
Install 59 Cameras Throughout the Facility